BLOGGER TEMPLATES - TWITTER BACKGROUNDS »

Latest Event

Latest Event
Solar Eclipse of 9 March 2016

Saturday, February 18, 2012

Galaxy Completed Engineering Integration

Two Recovery Chute was installed in the first section of the heading module.

Lower O Ring was installed to form a platform.

The Upper Transport Service Module (UTSM) was intalled.

Today, Dragon X had completed the engineering integration of Galaxy vehicle at the Space Vehicle Assembly Center (SVAC), High Bay 3.

The integration which involved the first installation, the two Recovery Chute to the vehicle, which then been installed by the first section of the heading module. Then the Lower O Ring was installed to the lower part of the first section heading module, which act as the platform that will support the final installation of the Upper Transport Service Module (UTSM).

0 comments: