Tomorrow night, 31 October 2011, at about 9pm to 10pm, Dragon X Team will depart from SMJK Chung Cheng, Kota Bharu heading ahead to Kuala Perlis by a night bus journey. The journey from Kota Bharu to Kuala Perlis was expected to be about 8 to 9 hours, and the ferry journey from Kuala Perlis to Kuah Town, Langkawi was about 1 hour 15 minutes.
Latest Event
Sunday, October 30, 2011
Dragon X Team On Trip To Langkawi Island
Posted by Unknown at 8:39 PM 0 comments
Dragon X Readies Galaxy Design b Launch
Today, Dragon X had considered to readies again the launch of Galaxy Design b vehicle as the first Potassium Nitrate (KNO3) fuel test. Dragon X Researcher, Reuel Ong and volunteer, Eddie Chua said that they maybe get the fuel by this Thursday, so Dragon X again decided to readies the vehicle launch again to the next Friday or Saturday. The new launch window for the launch has not been selected yet.
Posted by Unknown at 8:35 PM 0 comments
Saturday, October 29, 2011
Dragon X Set To Mark New History
On 24 November 2011, at 3.45pm, Dragon X will begin its first step to mark new history as Galaxy roll out from the Space Vehicle Assembly Center (SVAC) toward Launch Complex 21.
Posted by Unknown at 11:52 AM 0 comments
Friday, October 28, 2011
Dragon X Under Fuel Progress
Dragon X is now in work of searching for Potassium Nitrate (KNO3) fuel to install into Galaxy Design b vehicle which was delayed from 25 October 2011 (Tuesday) to 30 October 2011 (Sunday) due to fuel installation error.
Posted by Unknown at 6:16 PM 0 comments
Wednesday, October 26, 2011
Dragon X Mock Up Galaxy
Dragon X had completed 45% of the Simulator Deck (DC) for Galaxy X1. Mock up had been completed and the vehicle is now awaiting for its fuel and parachute to be installed.
Posted by Unknown at 1:54 PM 0 comments
Tuesday, October 25, 2011
Galaxy Design b Launch Delayed
Today scheduled launch of Galaxy Design b vehicle as the first fuel test for Potassium Nitrate (KNO3) was delayed due to the lack of Potassium Nitrate fuel.
Posted by Unknown at 7:44 PM 0 comments
Sunday, October 23, 2011
Meeting For KNO3 Preparation
Dragon X will make a meeting on tomorrow, 24 October 2011, Monday for discussing about the fuel preparation for Galaxy Design b launch on 25 October 2011 as the first fuel test for KNO3 Project.
Posted by Unknown at 7:03 PM 0 comments
Friday, October 21, 2011
Dragon X Aerospace 4th Anniversary
Dragon X Aerospace is celebrating its 4th year of anniversary today since it was founded on 21 October 2007 by Cameron Tan and Charles Ooi.
Posted by Unknown at 2:49 PM 0 comments
Thursday, October 20, 2011
Dragon X's Crew Camping
On 18 October 2011 to 20 October 2011 (Tuesday to Thursday), Dragon X Crew: Cameron Tan, Sean Quek and Chester Cheng participated in a course camp called, Kem Kursus 1 Murid 1 Sukan. With the other schoolmate: Chook Shun Kent, Kang Yee Hui, Chu Jenn Anne, Lee Sian Mei and Lee Leng Wei. We also met some new friends from SMJK Chung Hwa.
Posted by Unknown at 10:19 PM 0 comments
Sunday, October 16, 2011
Saturday, October 15, 2011
Simulator Deck Outer Structure Completed
Dragon X Team: Cameron and Chester had completed the building of the outer structure of Galaxy's Simulator Deck (SD), or also mean as the capsule of the vehicle. Mock up is scheduled on a week before the rollout on 24 November 2011.
Posted by Unknown at 10:02 PM 0 comments
Friday, October 14, 2011
Galaxy Design b In SVAC High Bay 3-1A
Dragon X's test vehicle, Galaxy Design b is now building at the Space Vehicle Assembly Center (SVAC), High Bay 3-1A. Galaxy Design b is scheduled to be launch on 06 November 2011.
Posted by Unknown at 5:10 PM 0 comments
Wednesday, October 12, 2011
Tuesday, October 11, 2011
Dragon X Unwrapped Galaxy Booster
Just now, an hour ago, Dragon X unwrapped Galaxy's booster at the Space Vehicle Assembly Center (SVAC) to prepare for the next step of building.
Posted by Unknown at 4:07 PM 0 comments
Saturday, October 8, 2011
Dragon X To Unwrapped Galaxy Booster
Schedule on this 11 October 2011, Tuesday evening, Dragon X will unwrapped Galaxy's Booster at the Space Vehicle Assembly Center (SVAC) to resume the building of Galaxy rocket. As it, Multipurpose Launcher Platform (MLP) was also expected to arrive to SVAC on next week.
Posted by Unknown at 1:12 PM 0 comments
Monday, October 3, 2011
Sunday, October 2, 2011
Dragon X Released New Galaxy Heavy Launch Design
Art concept of Galaxy X1 Development Flight launch from Launch Complex 21 on 24 November 2011, Thursday, scheduled at 4.21pm.
Posted by Unknown at 7:49 PM 0 comments