BLOGGER TEMPLATES - TWITTER BACKGROUNDS »

Latest Event

Latest Event
Solar Eclipse of 9 March 2016

Saturday, August 21, 2010

Aquarius Redied For Mission

Aquarius originally planned for mission on 20 August 2010, Friday had redied. Srubed by a stormy weather condition. Aquarius is again planned for mission on today's at 1:35pm launch window.

Monday, August 9, 2010

GTM Clear For Underwater Mission

Dragon X had successfully located the Geocentric Tracker Molecule, or also as known as GTM, into a pond. The Deep Ocean Coordinates (DOC) payload system, GTM touched down onto the underwater land on 31 July 2010, Saturday, at 2:19pm (MLT).

Originally scheduled mission for GTM was on 02 June 2010, Wednesday. But because of the GTM's development problem, the mission was readied to 31 July 2010. GTM touched down perfectly onto the underwater land by its four landing gears at 2:19pm. The first underwater images was taken and received 15 minutes after GTM touched down.
"GTM would not be durable in the underwater for mission of more than a month. GTM was just can be stand for operating in the underwater for 1 month." told Dragon X. Since GTM began its cleaning mission, its was the ninth days for GTM to stand on operation.
Good Luck, GTM!